In
the Gulf Coast region, a common problem with wells above
12,000 feet is production of sand. A cost-effective
method of controlling sand production and optimizing
production is to employ water packs as the primary or
through-tubing completion method. We have the ability
to perform water packs and gel gravel packs when needed
in primary or through-tubing completions, utilizing
a sand injector, auxiliary equipment, and our sand-control
design expertise. |
 |
High-rate sand control blender |
| |
 |
Low-rate sand injector |
|
|