|
HOW WISE MODULAR MULTIFUNCTION
UNITS CUT THE COST OF OFFSHORE WELL INTERVENTION
Offshore, WISE multifunction technology
typically cuts coiled tubing intervention costs by 60% and,
often by much more. Most of the savings are a result of using
smaller support vessels or by eliminating the need for a support
vessel. Our compact, lightweight modules are easily handled
by offshore cranes and can be arranged on decks to fit the
space available, without impairing functionality.
Deepwater
structures: eliminate the service vessel
Deployment on platforms (1,200 sq ft available space
or less) beyond liftboat depth eliminates need for a
semisubmersible work vessel. Savings can exceed $60,000
per day.
Small
platforms: eliminate the liftboat
Deployment on small platforms eliminates need for a
liftboat. Savings can exceed $15,000 per day.
Caisson
wells: use a smaller liftboat
Deployment on smaller liftboats (e.g. Class 105 vs Class
200) can save $10,000 per day or more.
Eliminate
liquid nitrogen resupply
WISE site-generated nitrogen module eliminates need
to transport liquid nitrogen resupply from shore, saving
approximately $6,000 per trip.Site-generated nitrogen
also eliminates downtime caused by weather interruption
of liquid nitrogen resupply; cost savings can be enormous.
|