A
COMPLETE COILED TUBING/NITROGEN SPREAD ON A
900-SQ-FT MONOPOD PLATFORM DECK
| Only WISE Well Intervention can deliver
complete coiled tubing and nitrogen intervention services
to almost any well, anywhere, even on small platforms
like the monopod structure shown below. Conventional coiled
tubing equipment could not be deployed on the platform,
yet the well required a sand control treatment that had
to be placed through coiled tubing. With our streamlined,
lightweight modules, we were able to place a full-capability
coiled tubing/nitrogen spread on the platform deck, eliminating
the need for a liftboat and saving approximately $20,000
per day. |
| |
 |
| The monopod deck has a usable area of
less than 900 sq ft. |
| |
 |
| In this photo, the control cabin is next
to the coiled tubing reel, with a liquid nitrogen tank
in the foreground. |
| |
 |
| This photo, taken from the opposite direction,
shows the injector head at left, with the power unit/pump
skid next to the control cabin. |
| |
| |
|